Project 01

Hyperscale Data Center Fitout

Frankfurt am Main
Client
International hyperscale operator
Complete fitout of 3 data halls, totaling 4,500 m2 — from substructure to turnkey handover.
Duration
14 Weeks
Area
4,500 m2
Highlights
Raised floor installation
2N+1 power supply
450 racks installed
Cold aisle containment
Services
Data Hall FitoutInfrastructure InstallationBMS Installation
Result
On-time handover, PUE 1.28
Project 02

UPS Modernization

Munich
Client
Leading European colocation provider
Replacement of 6 UPS systems during live operations — without interruption to critical systems.
Duration
8 Weeks
Total Capacity
3 MW
Highlights
Zero-downtime migration
3 MW total capacity
STS integration
Services
Infrastructure InstallationMaintenance & Repair
Result
99.999% availability during migration
Project 03

DGUV Campaign

Nationwide
Client
Major German data center operator
DGUV inspection at 12 locations with over 15,000 pieces of equipment — centrally coordinated and digitally documented.
Duration
6 Months
Equipment
15,000+
Highlights
Coordination across 12 locations
Digital test protocols
15,000+ items inspected
Services
DGUV InspectionsThermography & Analysis
Result
All locations inspected on schedule, 340 deficiencies identified and resolved
Project 04

Security Upgrade

Amsterdam
Client
Tier IV data center of a financial services provider
Complete renewal of access control and video surveillance for a Tier IV data center with the highest security requirements.
Duration
10 Weeks
Cameras
120 IP cameras
Highlights
Biometric airlocks
120 IP cameras
BMS integration
Services
Entry SystemsCCTV SurveillanceBMS Installation
Result
ISO 27001 certification passed
Project 05

PUE Optimization

Berlin
Client
Mid-sized colocation operator
Comprehensive energy efficiency program across 2 data halls — from analysis to implementation of optimization measures.
Duration
4 Months
Savings
180,000 EUR/year
Highlights
Airflow analysis
Cold aisle containment retrofitted
Cooling optimization
Services
PUE OptimizationThermography & AnalysisConsulting
Result
PUE reduced from 1.65 to 1.31, 180,000 EUR annual energy cost savings
Project 06

Server Fleet Troubleshooting

Dusseldorf
Client
Cloud service provider
Diagnosis and repair of over 800 servers after a critical firmware issue — under maximum time pressure.
Duration
3 Weeks
Servers
800+
Highlights
On-site team of 8 technicians
24/7 shift operations
800+ servers diagnosed
Services
Server Hardware Troubleshooting24/7 Emergency Support
Result
98% of servers back online within 72 hours